Question

$40.00 Need help questions or due on May 29, 2012

Asked by :
Arobin15
Arobin15
Rating :No Rating
Questions Asked: 82
Tutorials Posted: 0
 
 
Q:
• D.9 Zimmerman’s Bank is the only bank in the small town
of St. Thomas. On a typical Friday, an average of 10 customers per
hour arrive at the bank to transact business. There is one teller at the
bank, and the average time required to transact business is 4 minutes.
It is assumed that service times may be described by the exponential
distribution. A single line would be used, and the customer
at the front of the line would go to the first available bank teller. If a
single teller is used, find:
a) The average time in the line.
b) The average number in the line.
c) The average time in the system.
d) The average number in the system.
e) The probability that the bank is empty.
 
attachement
Attachments:
MODULE 7.xlsx (11K)
 

Want to take a stab at the bounty and post a tutorial? Need clarification? Join us now or log in! Read more on how this works.
Available Tutorials to this Question
 
$40.00
All answer to the question.
  • This tutorial was purchased 1 time and rated No Rating by students like you.
  • Posted on May 28, 2012 at 7:45:55PM
Posted by :
ridho
ridho
Rating (89):A
Questions Asked: 2
Tutorials Posted: 229,
Earned: $3,035.91
 
A:
Preview: ... his is all answ ...

The full tutorial is about 15 words long plus attachments.

attachmentlogo

Attachments:
MODULE 7 - Answer.xlsx (24K)
 
$40.00
module 7
  • This tutorial hasn't been purchased yet.
  • Posted on May 31, 2012 at 6:28:31PM
Posted by :
manman1989
manman1989 Not confirmed
Rating :No Rating
Questions Asked: 0
Tutorials Posted: 5,
Earned: $0.00
 
A:
Preview: ... The average time in the line. b) The average number in the line. c) The average time in the system. d) The average number in the system. e) The probability that the bank is empty.     Answer the following questions (use MS Project Help, if necessary): What is the difference between a main summary task and a summary task?   The main summary task is a brief description of the project an ...

The full tutorial is about 342 words long .
 
$30.00
All Questions _assignment_Correct_Answer
  • This tutorial hasn't been purchased yet.
  • Posted on May. 14, 2013 at 07:25:35AM
Posted by :
mnjkr123
mnjkr123 Not confirmed
Rating (244):A+
Questions Asked: 8
Tutorials Posted: 1831,
Blog Posts: 1,
Earned: $18,154.70
 
A:
Preview: ... ve the following linear programming problem graphically:                             Ans:     Maximization function is P = 4x+ 6y should be Max.   Constraints are:   x+ 2y   5 x+ 4y Red Line in the Graph Below)     x, y >= 0   B.7 The ...

The full tutorial is about 239 words long plus attachments.

attachmentlogo

Attachments:
All Questions _assignment_Correct_Answer.docx (70K) (Preview)